1988 Technical Reports
- Y. Fathi, "A Note on Taguchi's Concept of Producer's Tolerance,"
Technical Report 219, May 1988.
- S. E. Elmaghraby, "Project Bidding Under Deterministic and
Probabilistic Activity Durations," Technical Report 220, June 1988.
- S. E. Elmaghraby and D. J. Michael, "Documentation of Bidnet:
Project Bidding for CPM and PERT Activity Networks," Technical Report 221,
June 1988.
- S. E. Elmaghraby and W. S. Herroelen, "The Scheduling of
Activities to Maximize the Net Present Value of Projects," Technical Report
222, June 1988.
- M. F. M. Stallmann and W. W. Bein, "Decomposition and Reduction
of Directed Acyclic Graphs," Technical Report 223, June 1988.
- Y. Fathi, "Robust Design of Manufactured Products: An Analytical
Approach," Technical Report 224, September 1988.
- Y. Fathi, "Optimal Design of a Wheatstone Bridge Using SQVAM,"
Technical Report 225, September 1988.
- W. G. Ferrell, Jr. and S. E. Elmaghraby, "Quality Assurance
and Stage Dynamics in Multi-Stage Manufacturing: Part I," Technical Report
226, October 1988.
- S. E. Elmaghraby and W. G. Ferrell, Jr., "Quality Assurance
and Stage Dynamics in Multi-Stage Manufacturing: Part II," Technical Report
227, December 1988.
- W. G. Ferrell, Jr. and Y. Fathi, "Acceptance Sampling Under
Continuous Loss Function," Technical Report 228, December 1988.
- S. E. Elmaghraby and J. Kamburowski, "On Project Representation
and Activity Flows," Technical Report 229, January 1989.